Showing posts with label Richenbaugh. Show all posts
Showing posts with label Richenbaugh. Show all posts

Friday, September 14, 2007

Prepping and installing posts and picket frames. Will be back to install the pickets Monday or Tuesday. The electrician will be in next week to move the switch and light, then we will finish the drywall patching and texture.


Thursday, August 30, 2007

Were done until next Tuesday. Stairs reassembled, lid with the scaffolding out of the way. Dave calking the siding to trim and the first coat of mud.


Wednesday, August 29, 2007

Siding and trim done, drywall patched. Will start mudding and reassemble stairs tomorrow.

Tuesday, August 28, 2007

The door is hung, doggie door and hardware installed. Trim and drywall patching next.


Monday, August 27, 2007

The half hole. Had to wait for the electrician so will set the door tomorrow. Cut a couple of holes in the garage to reroute the power, which is done.


Tuesday, August 21, 2007

We finished setting up this morning and started prep for the fascia, and ran most of the t&g. Will finish tomorrow.