Saturday, June 24, 2006


Same Posted by Picasa

Project complete. Posted by Picasa

Doing some fine tuning with the lift.  Posted by Picasa

Ready for floor joist. Posted by Picasa

Ground floor for a new log home. Posted by Picasa

Latest project. Posted by Picasa

Thursday, June 15, 2006


Looking from the other direction. Posted by Picasa

Close up from the top. Posted by Picasa

The finished wall sections. Posted by Picasa

Back filling the hard way. Posted by Picasa

Installing last courses. Posted by Picasa

Wednesday, June 14, 2006


We have 2 more courses to run, the power went out in the area right at 12 so we had to stop for the day. I was out there around 3 and it's back on. So it will be done tomorrow morning. Posted by Picasa

Almost done. Posted by Picasa

Monday, June 12, 2006


Filled and cut and ready to start the second tier. The cut was done in 2 parts to protect the trees which are within a foot of the cut. And also to protect the lawn. Posted by Picasa

Back filling the first tier with the cut from the second tier. Posted by Picasa

Starting the second tier cut. Posted by Picasa

Saturday, June 10, 2006


same Posted by Picasa

Completed first level. Posted by Picasa

Wednesday, June 07, 2006


Day 3. We have had a lot of shovel work. The upper section has to be cut back another 2 1/2 feet once we reach the 3 foot hight of the first level. We are hoping to do this with out disterbing the trees. Posted by Picasa

Tuesday, June 06, 2006


We had a lot of shovel work to do before we could start laying timbers. Should be up to the first 3 foot step tomorrow. Posted by Picasa

Installing the next course. Posted by Picasa

Trenching for the first course. Posted by Picasa

Day 2 Posted by Picasa

Monday, June 05, 2006


Quite the mess. Ready to start the new wall. Posted by Picasa

Second load. Posted by Picasa