Thursday, November 15, 2007

Siding.

Wednesday, November 14, 2007

The 5/8" osb was the way to go.

Thursday, November 08, 2007

Back over hang is done, will reset the window and panel the gable.

Wednesday, November 07, 2007






Wall's poured today. That's your lot from hwy 40. If you look you can see the pump boom over the trees.

Tuesday, November 06, 2007

The soffet is done and the wall is sheeted.

Friday, November 02, 2007





Thursday, October 25, 2007


Wednesday, October 24, 2007


Tuesday, October 23, 2007

Windows and doors are inventoried and secured in the storage container.

Friday, October 19, 2007

Finish up next week weather permitting.
Lots of stuff.


Wednesday, October 17, 2007

Got everything out of our way and started installing the panels.



Thursday, October 11, 2007



Tuesday, October 09, 2007

Prepping the well connection. Dave cutting and stacking the trees along the driveway. Setting footing boards.


Laying out the foundation again. The surveyors pins are off, still. The hole, and pulling the well pump to hook up the water.


Tuesday, October 02, 2007

The hole is dug. Should start forming the footings Thursday.